Back to Policy
Policy Player
Policy PlayerTopic 1 of 4
Plan Before You Open Any Line
Press play to listen0%
A line break is planned, permitted and prepared — never improvised.
1. A line breaking permit issued for the specific line and task.
2. Confirm the product, its hazards and the last known condition of the line.
3. Identify both sides of the break point and every connected system.
4. Define the drain or receptor for any residual product.
5. Brief the crew on the sequence and what to do if product appears.
1 / 4