Skyline Renewable Energy

Skyline Renewable Energy — Life Critical Policy

Permit to Work

Permit to Work

Policy Summary

High-risk work is never started on a verbal instruction. A written permit identifies the hazards, confirms the controls are physically in place, names who is accountable, and formally hands the area back on completion.

Policy Topics

When a Permit Is Required

When a Permit Is Required

A permit is mandatory for any work that can harm people, product or the environment.

  • Hot work, confined space entry, excavation, line breaking and work at height.
  • Energy isolation and any work on live or recently live process equipment.
  • Non-routine maintenance, simultaneous operations and work near incompatible activity.
  • Any task where the hazards cannot be controlled by routine procedure alone.

If you are unsure whether a permit is needed, stop and ask — never assume.

What a Valid Permit Contains

A permit without detail is a blank sheet of paper.

  • Exact scope, location and equipment covered.
  • Hazards identified and the controls for each.
  • Isolation and lockout requirements, gas test results and their validity.
  • Required PPE, competent persons and standby roles.
  • Emergency arrangements, escape routes and communication.
  • Start and expiry time, with signatures of issuer and receiver.

Field Verification Before Start

Field Verification Before Start

Signing is not the same as verifying.

1

Walk the job and confirm every listed control physically exists.

2

Confirm isolations, locks, blinds and barriers are in place.

3

Confirm the gas test is current and within limits.

4

Brief the whole crew on scope, hazards and stop-work authority.

5

Display the permit at the worksite for the duration of the job.

Suspension, Handover and Close-out

The permit ends when the work does — not when the shift does.

  • Suspend the permit immediately if conditions change: weather, product transfer, alarm or loss of a control.
  • Revalidate before restarting after any suspension, break or shift change.
  • Never leave work open overnight on an unexpired permit without formal revalidation.
  • Close out only when the area is restored, isolations removed in sequence and the equipment is safe to return to service.
  • Return the signed permit to the issuing authority.

Demonstrate Your Understanding

Complete the compliance quiz to confirm your understanding of this life critical policy.